Role: Studio Director | Sr. Project Manager, at Peter Culley’s, Spatial Affairs Bureau
Objective: Design a contemporary 'down to the stud' remodel of this 1920 Spanish bungalow. Incorporate rigorous Passive House energy conservation standards for a reduced ecological footprint.
Square Footage: 1,700sf
Construction Status: Completed
Responsibilities: Managed the LADBS permitting process from schematic design through construction docs and RTI. Direct studio operations, ensuring timely response to all RFI’s, ASKs and submittals. Managed studio’s financial operations with project P&L responsibility. Conducted contractor bidding, defining scopes of work and performing quality control on behalf of Client. Act as GC’s pont of contact for all RFI’s.
Lakeshore Avenue
Echo Park, Los Angeles
Echo Park, Los Angeles