Dana Reid
General Contractor | Construction Project Mgr.












Bouverie Mews
London, England




Role: Studio Director | Sr. Project Manager at Spatial Affairs Bureau architecture studio

Objective: Residential home remodel for London based acclaimed artist, Rana Begum, creating a gallery space and art studio in addition to providing reconstructed living residence. 

Square Footage: 5,167sf

Construction Status: Completed

Responsibilities: Direct studio operations, ensuring timely response to all RFI’s, ASKs and submittals.  Managed studio’s financial operations with project P&L responsibility.









              













Crosstown Arts, Crosstown Concourse
Memphis, Tennessee

Hypostyle Hall




Role: Studio Director | Sr. Project Manager at Spatial Affairs Bureau architecture studio

Objective: Adaptive reuse of an abandoned Sears regional distribution center, transforming the dilapidated monolith into an art center consisting of: art galleries, shared community art making facilities, digital suites, sound recording rooms, artist in residence studios and rental residences. The full complex, named Crosstown Concourse, gave birth to the art center portion, named Crosstown Arts. Spatial Affairs Bureau designed the Crosstown Concourse Master Plan, and construction documents for Crosstown Arts creative spaces and theater.

Square Footage: 40,000sf

Construction Status: Completed

Responsibilities:  Monitor and control: scope creep, contract compliance, studio resource coordination, project performance, and phase closure. Direct studio operations, ensuring timely response to all RFI’s, ASKs and submittals.




Fluorescent Coral Stair


 
 















Responsibilities: Managed the LADBS permitting process from schematic design through construction docs and RTI. Direct studio operations, ensuring timely response to all RFI’s, ASKs and submittals.   Managed studio’s financial operations with project P&L responsibility.  Conduct contractor bidding, defining scopes of work and quality control on behalf of Client and owner. Act as GC’s pont of contact for all RFI’s.


North Broadway
Lincoln Heights, Los Angeles



Role: Studio Director | Sr. Project Manager at Spatial Affairs Bureau architecture studio

Objective: Gut and remodel dilapidated Lincoln Heights bungalow

Square Footage: 593sf

Construction Status: Completed







































Breeze Avenue — Venice, CA


Role: Studio Director | Sr. Project Manager at Spatial Affairs Bureau architecture studio

Objective: Remodel of a 1912 Venice Bungalow, adding lofted room addition, balcony and bathroom.

Square Footage: 1,095sf existing, 1,200sf new

Construction Status: Completed

Responsibilities: Managed the LADBS permitting process from schematic design through construction docs and RTI. Direct studio operations, ensuring timely response to all RFI’s, ASKs and submittals.   Managed studio’s financial operations with project P&L responsibility.  Conducted contractor bidding, defining scopes of work and performing quality control on behalf of Client. Act as GC’s pont of contact for all RFI’s.   






















24th St. - Santa Monica, CA
7000sf New Build Under Construction
Completed May 2025





︎     ︎